Fallout Wiki
Advertisement
Fallout Wiki
 
Gametitle-FO4
Gametitle-FO4

The Weston water treatment plant terminal entries are entries found on various terminals in and around the Weston water treatment plant in Fallout 4.

Grounds terminal

Terminal (Novice locked) is located on the plant's roof.

Transcript

Welcome to Weston WaterLINC
Grounds Office

Memo: Weston Media Event

Transcript

To: All Employees
Re: Weston WELLness Media Event, 10/26

As a reminder, members of the local and national media will be touring the facility on Tuesday, 10/26, as part of the Weston WELLness press initiative. Employees are expected to be polite, courteous, and discreet at all times. All questions, especially those pertaining to the recent cholera outbreak, are to be directed to the nearest Weston Public Relations Officer.

Cartons of Weston Water will be distributed. Encourage the press to Taste Perfection(TM).

Expect double shifts on Wednesday to make up for lost productivity. --Saul

> Safe Control

Transcript

Safe Lock Mechanism Status: LOCKED/UNLOCKED

Accessing Safe Functions...

Disengage Lock

Transcript

...Checking Clearance..........
...AUTHORIZED.................
...Locking Mechanism Disable..

Accessing Safe Functions...

Engage Lock

Transcript

...Checking Clearance..........
...AUTHORIZED.................
...Locking Mechanism Enable...

Accessing Safe Functions...

> Spotlight Control

Transcript

Standardized Spotlight Control BIOS
ADMIN:
UNITS CONNECTED: 1

Please choose an option:

(De)activate Light(s)

Transcript

Spotlight(s) activated../shutting down..

System Diagnostics

Transcript

System Diagnostics: 1 Spotlights Linked
Node | Condition | Status | Distance
---------------------
Spotlight Online/Offline, No Intruder Detected, 25.22m

Facilities terminal

Transcript

Welcome to Weston WaterLINC
Facilities Office - Mr. Theodore Marks

Memo: Weston Media Event

Transcript

To: All Employees
Re: Weston WELLness Media Event, 10/26

As a reminder, members of the local and national media will be touring the facility on Tuesday, 10/26, as part of the Weston WELLness press initiative. Employees are expected to be polite, courteous, and discreet at all times. All questions, especially those pertaining to the recent cholera outbreak, are to be directed to the nearest Weston Public Relations Officer.

Cartons of Weston Water will be distributed. Encourage the press to Taste Perfection(TM).

Expect double shifts on Wednesday to make up for lost productivity. --Saul

Facilities Log

Transcript

Please select a log file to view:

10/18

Transcript

10/18

Finished waterproofing upgrades to the turret defense system. Initial tests seem promising-- the new sensors should shut them down if the place gets flooded out again. I'll just be grateful if they don't short out every other week.

10/19

Transcript

10/19

Well, they work. Emmis was cleaning the sedimentation tank and forgot to close the intake valve again. Big gusher. Turret 4 snapped shut before it took any damage, then popped back out as soon as they got the valve closed. Good as new. Too bad about Emmis, though.

10/21

Transcript

10/21

Routine maintenance on the flood control pumps. Not that they needed it. Central may have skimped on everything else, but those things will last forever.

10/22

Transcript

10/22

Saul's throwing some kind of press junket on Tuesday. Whole staff will be working overtime Monday to tidy up. Told them I needed the day to reprogram the turret system so it didn't shoot the guests. Ten minutes on that, and I can spend the rest of the day doing something more productive. Red Menace?

> Turret Control

Transcript

Accessing Turret Functions...

Standardized Turret Control Firmware v8.13
STATUS: ERROR, All Clear
ADMIN: Turret Defense System
UNITS CONNECTED:10

Please exercise caution around turret. Users should always assume that turrets are loaded and capable of live-fire.

Please choose an option:

Activate

Transcript

Activating

Deactivate

Transcript

Shutting Down

About your Defense System

Transcript

Loading Terms of Usage...

Turret operation should be limited to trained professionals only.

Consumer commands are limited to activation/deactivation of the turret(s) hardlined to this terminal. For all other operations, please refer to a licensed technician.

Any tampering will void warranty and indemnify the manufacturer against potential injury and/or death caused by users or passers-by.

System Diagnostics

Transcript

System Diagnostics: 10 Turrets Linked
Node | Condition | Status | Distance
---------------------
0% Offline,ERROR, 13.36m
0% Offline,ERROR, 10.17m
0% Offline,ERROR, 23.17m
0% Offline,ERROR, 64.35m
0% Offline,ERROR, 72.44m
0% Offline,ERROR, 71.71m
0% Offline,ERROR, 72.62m

Flood control station

Transcript

Welcome to Weston WaterLINC
Flood Control Station #1

System Diagnostics

Transcript

--- FACILITY STATUS ---
Main Power: OFF
Secondary Power Supplies: 27%
Security System: ACTIVE

--- PUMP STATUS ---
Main Pump: **ERR17** - 3% Capacity
Flood Control Pumps Active: 4/4
Flood Control Pump #1: ACTIVE
Flood Control Pump #2: ACTIVE
Flood Control Pump #3: ACTIVE
Flood Control Pump #4: ACTIVE

Operating Instructions

Transcript

Mark-VI Industrial Flood Control System
Operating Instructions

This facility has been equipped with [4] Mark-VI Emergency Flood Control Pumps. This fully-automated water removal solution should keep your facility secure and dry for decades to come.

In the unlikely event of a major flooding incident, a Mark-VI pump that has been fully submerged in water may stall. To restart the pump, use the automated software on this terminal, or locate the Pump Control Switch near the pump and flip the breaker. This will activate a secondary motor, which should clear the jam and return the pump to normal operation.

Front office terminal

Transcript

Welcome to Weston WaterLINC
Front Office

Memo: Weston Media Event

Transcript

To: All Employees
Re: Weston WELLness Media Event, 10/26

As a reminder, members of the local and national media will be touring the facility on Tuesday, 10/26, as part of the Weston WELLness press initiative. Employees are expected to be polite, courteous, and discreet at all times. All questions, especially those pertaining to the recent cholera outbreak, are to be directed to the nearest Weston Public Relations Officer.

Cartons of Weston Water will be distributed. Encourage the press to Taste Perfection(TM).

Expect double shifts on Wednesday to make up for lost productivity. --Saul

Office Supply Order

Transcript

Office Supply Order
Week of 10/17

1 Box
Weston WELLness Stationary

3 Cartons (60)
Weston Embossed Souvenier Pens

2 Boxes
Business Cards (Mr. Arenson, Mr. Marks)

50 Gallons
Nut Island Drinking Water

1 Crate (400)
Weston Water Cartons, Empty

Disengage Lock

Transcript

Accessing Safe Functions...

...Checking Clearance..........
...AUTHORIZED.................
...Locking Mechanism Disable..

Engage Lock

Transcript

Accessing Safe Functions...

...Checking Clearance..........
...AUTHORIZED.................
...Locking Mechanism Enable...

> Spotlight Control

Transcript

Standardized Spotlight Control BIOS
ADMIN:
UNITS CONNECTED:1

Please choose an option:

Activate Light(s)

Transcript

Spotlight(s) activated...

Deactivate Light(s):

Transcript

Spotlight(s) shutting down...

System Diagnostics

Transcript

System Diagostics: 1 Spotlights Linked
Node | Condition | Status | Distance
---------------------
Spotlight Online/Offline,No Intruder Detected, 25.22m

Manager's terminal

Transcript

Welcome to Weston WaterLINC
Operations Manager - Mr. Saul Arenson

Memo: Weston Media Event

Transcript

To: All Employees
Re: Weston WELLness Media Event, 10/26

As a reminder, members of the local and national media will be touring the facility on Tuesday, 10/26, as part of the Weston WELLness press initiative. Employees are expected to be polite, courteous, and discreet at all times. All questions, especially those pertaining to the recent cholera outbreak, are to be directed to the nearest Weston Public Relations Officer.

Cartons of Weston Water will be distributed. Encourage the press to Taste Perfection(TM).

Expect double shifts on Wednesday to make up for lost productivity.

Memo: Operating Budget

Transcript

To: Senior Staff
Re: Operating Budget

The second quarter saw record losses in our Massachusetts Regional division. High operating costs and a difficult regulatory environment have led to some of the worst business conditions in recent years. Innovative solutions are urgently needed if we are to remain the market leader in civic and municipal utility services.

Management would like to commend the work of Mr. Saul Arenson, Weston Operations Manager, for his bold experiments in wasterwaterIn-game spelling, punctuation and/or grammar recycling. We feel confident that the risks to public health are minimal, and the reduction in treatment costs will have a significant impact on our fiscal outlook.

Advertisement