Fallout Wiki
Fallout Wiki
m (moved Jericho Water Plant to Jericho water plant)
No edit summary
(15 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{incomplete}}
 
{{image}}
 
 
{{Infobox location
 
{{Infobox location
|game =VB
+
|games =VB
|name ={{PAGENAME}}
+
|type =building
|image =empty
+
|image =VB DD10 map Jericho Town map.jpg
  +
|image desc =The water plant located in the north
  +
|owners =[[Jake Caulwell]]
  +
|part of =[[Jericho (town)|Jericho]]
  +
|quests =[[Resolve Jericho Water Plant Issues]]<br />[[Fix the leaks in the plant]]<br />[[Build an automated water pump]]<br />[[Sabotage the water plant]]
 
}}{{Games|VB}}{{VB}}
 
}}{{Games|VB}}{{VB}}
   
  +
{{quotation|It's pretty simple, actually. Salt water gets pumped in from the lake to the boilers, the salt gets boiled out of the water, the steam condenses in those contraptions there, and the fresh water collects in the vat.|[[Jake Caulwell]]}}
The '''{{PAGENAME}}''' is the water treatment plant in the town of [[New Canaan]]. A group of Squatters got it working in 2236.
 
  +
 
The '''Jericho water plant''' is the water treatment plant in the town of [[New Canaan]]. A group of squatters got it working in [[Timeline#2236|2236]].
  +
  +
The desalination plant is the largest and oldest building in town. It's loud, hot, and noisy inside when the plant is in operation during the day. Large pipes run around everywhere on the inside, and on the eastern exterior wall is a filling station where the water caravans fill up their barrels.
  +
  +
In [[Timeline#2253|2253]], the plant is currently being run by [[Jake Caulwell]]. He doesn't actually do any work within the plant, usually just keeping an eye on the convicts doing all of the actual labor.
   
 
==Appearances==
 
==Appearances==
{{PAGENAME}} was going to appear in ''[[Van Buren]]'', the canceled ''Fallout 3'' by [[Black Isle Studios]].
+
The Jericho water plant was going to appear in ''[[Van Buren]]'', the canceled ''Fallout 3'' by [[Black Isle Studios]].
   
{{stub-VB}}
+
{{Navbox Jericho}}
   
{{Navbox New Canaan}}
 
 
[[Category:New Canaan]]
 
[[Category:New Canaan]]
 
[[Category:Van Buren locations]]
 
[[Category:Van Buren locations]]

Revision as of 13:57, 3 January 2014

 
Gametitle-VB
Gametitle-VB
It's pretty simple, actually. Salt water gets pumped in from the lake to the boilers, the salt gets boiled out of the water, the steam condenses in those contraptions there, and the fresh water collects in the vat.Jake Caulwell

The Jericho water plant is the water treatment plant in the town of New Canaan. A group of squatters got it working in 2236.

The desalination plant is the largest and oldest building in town. It's loud, hot, and noisy inside when the plant is in operation during the day. Large pipes run around everywhere on the inside, and on the eastern exterior wall is a filling station where the water caravans fill up their barrels.

In 2253, the plant is currently being run by Jake Caulwell. He doesn't actually do any work within the plant, usually just keeping an eye on the convicts doing all of the actual labor.

Appearances

The Jericho water plant was going to appear in Van Buren, the canceled Fallout 3 by Black Isle Studios.